A bathroom renovation is one of the bigger investments you will make in your home, so the contract you sign matters just as much as the tiles you choose. A clear written agreement protects both you and your renovator, and it is often the difference between a smooth project and a stressful one.
On the Mornington Peninsula we meet plenty of homeowners who have been burned before, usually by a handshake deal or a one-line quote that left far too much unsaid. This guide walks through what a solid bathroom renovation contract should always include, so you can tell a professional agreement from a flimsy one before you commit.
A clear scope of works
The scope is the heart of any contract. It should describe exactly what is being done, room by room and task by task, so there is no ambiguity later. A vague scope is where disputes are born, because everyone remembers the conversation differently once work is under way.
- Demolition and rubbish removal.
- Plumbing rough-in and fit-off, and electrical works.
- Waterproofing to the relevant Australian Standard.
- Wall and floor tiling, including tile size and layout.
- Fixtures, fittings and joinery to be installed.
- Making good of adjoining surfaces such as ceilings and cornices.
Inclusions and exclusions
A good contract does not just list what is included, it also states plainly what is not. If wall relining, structural repairs or a new exhaust fan sit outside the price, that should be written down. Clear exclusions stop small assumptions from turning into awkward conversations halfway through the job.
Fixed price versus provisional sums
Understand which parts of your quote are a firm fixed price and which are provisional sums or allowances. A provisional sum is an estimate for something not yet fully specified, such as a tile budget before you have chosen your tiles. There is nothing wrong with provisional sums when they are genuine and clearly labelled, but you want to know where they sit so the final figure does not surprise you.
Payment schedule tied to progress
Payments should be staged against real milestones, not the calendar. A sensible schedule might link deposits and progress claims to demolition, rough-in, waterproofing, tiling and final fit-off. Be cautious of anyone asking for a very large upfront payment before work begins. A reasonable, progressive structure keeps everyone motivated and keeps your money aligned with completed work.
Start and finish dates, and the variations process
Your contract should nominate a start date and an expected completion, along with how delays outside anyone’s control are handled. Just as important is the variations process: a written method for pricing and approving any change before it happens. Genuine variations are normal in renovations, particularly when hidden damage appears once walls are opened. What matters is that they are documented and agreed in writing, not sprung on you verbally at the end.
Insurances, warranty and dispute resolution
A professional renovator carries public liability insurance, and for domestic building work over a certain value in Victoria there are further consumer protections and insurance requirements that apply. Ask to see current certificates. Your contract should also state the warranty on workmanship and set out a fair, step-by-step process for resolving any dispute. Domestic building contracts in Victoria come with legislated consumer protections, and a renovator who works to those standards will have nothing to hide about putting them in writing.
Repair Rebels is a registered building practitioner operating right across the Peninsula, from Mornington through to Sorrento, and we put everything in writing so you always know where you stand. If you would like a clear, itemised proposal for your project, explore our bathroom renovations in Mornington and get in touch through our contact page to arrange a no-pressure conversation.
Frequently asked questions
Do I legally need a written contract for a bathroom renovation in Victoria?
For domestic building work above a certain value, Victoria requires a written domestic building contract with specific consumer protections. Even for smaller jobs, a clear written agreement is strongly recommended so scope, price and responsibilities are documented for both parties.
What is a provisional sum in a bathroom quote?
A provisional sum is an estimated allowance for an item that is not yet fully specified, such as a tile or tapware budget before you have made a final selection. It is adjusted once the actual choice and cost are confirmed, so it should always be clearly labelled in your contract.
How should progress payments be structured?
Payments are best tied to completed stages such as demolition, rough-in, waterproofing, tiling and final fit-off, rather than fixed dates. Be cautious of large upfront demands before work begins. A progressive schedule keeps your money aligned with work that is actually finished.
Should the contract mention waterproofing certification?
Yes. The contract should confirm that waterproofing is carried out and certified by an appropriately licensed trade, to the Australian Standard, with documentation provided on completion. This protects you against future water damage and is a mark of a professional renovator.